Some notable projects for 2022, Quarter 3:

  • Carried out Eddy Current Testing (ECT) on boiler tubes in Abu Dhabi.

  • Performed corrosion under pipe support in Qatar.

  • Accomplished Phased Array Ultrasonic Testing (PAUT) on pipes and nozzle in Indonesia.

  • Executed Acoustic Pulse Reflectometry (APR) inspection on boiler tubes in Indonesia.

  • Won contract to carry out Automated Ultrasonic Testing (AUT) on subsea pipeline inspection in Abu Dhabi.

  • Conducted IRIS inspection on tubes in Abu Dhabi.

  • Carried out Long Range Ultrasonic Testing (LRUT) inspection of pipelines in Abu Dhabi.

  • Performed Magnetic Flux Leakage (MLF) on tank bottom inspection in Egypt.

  • Accomplished Acoustic Emission Testing for tanks in Brunei.

  • Executed Acoustic Pulse Reflectometry (APR) inspection for economizer tubes in UAE.

  • Won contract to perform Digital Radiography Testing (DRT) on insulated pipelines in Egypt.

  • Conducted Alternating Current Field Measurement (ACFM) for vessels in Abu Dhabi.

  • Carried out Acoustic Emission Testing (AET) for storage tanks in Indonesia.

  • Performed RMS inspection for storage tanks in Malaysia.