Some notable projects for 2022, Quarter 3:
Carried out Eddy Current Testing (ECT) on boiler tubes in Abu Dhabi.
Performed corrosion under pipe support in Qatar.
Accomplished Phased Array Ultrasonic Testing (PAUT) on pipes and nozzle in Indonesia.
Executed Acoustic Pulse Reflectometry (APR) inspection on boiler tubes in Indonesia.
Won contract to carry out Automated Ultrasonic Testing (AUT) on subsea pipeline inspection in Abu Dhabi.
Conducted IRIS inspection on tubes in Abu Dhabi.
Carried out Long Range Ultrasonic Testing (LRUT) inspection of pipelines in Abu Dhabi.
Performed Magnetic Flux Leakage (MLF) on tank bottom inspection in Egypt.
Accomplished Acoustic Emission Testing for tanks in Brunei.
Executed Acoustic Pulse Reflectometry (APR) inspection for economizer tubes in UAE.
Won contract to perform Digital Radiography Testing (DRT) on insulated pipelines in Egypt.
Conducted Alternating Current Field Measurement (ACFM) for vessels in Abu Dhabi.
Carried out Acoustic Emission Testing (AET) for storage tanks in Indonesia.
Performed RMS inspection for storage tanks in Malaysia.