Some notable projects for 2023, Quarter 1:
- Carried out corrosion mapping using Rapid Motion Scanner (RMS) for storage tanks in Malaysia.
- Performed Pulsed Eddy Current (PEC) inspection for baseline piping in Malaysia.
- Accomplished Magnetic Flux Leakage (MFL) inspection for air cooler tubes in Dubai.
- Executed Magnetic Flux Leakage (MFL) inspection for bottom tanks in Indonesia.
- Won contract to perform Acoustic Pulse Reflectometry (APR) inspection on tubes in Egypt.
- Conducted Automated Ultrasonic Testing (AUT) inspection on quench columns in Qatar.
- Completed Long Range Ultrasonic Testing (LRUT) on pipeline in Qatar.
- Implemented IRIS inspection on heat exchanger tubes in Abu Dhabi.
- Secured contract for Eddy Current Testing (ECT) on chiller tubes in Dubai.
- Landed contract for Phased Array Ultrasonic Testing weld inspection on pipelines in Abu Dhabi.
- Carried out Acoustic Pulse Reflectometry (APR) inspection on heat exchanger tubes in Malaysia.
- Performed Acoustic Emission Testing (AET) for tanks in Saudi Arabia.
- Accomplished Phased Array Ultrasonic Testing (PAUT) C-Scan inspection in Malaysia.
- Executed Acoustic Emission Testing (AET) for fuel tank in Indonesia.
- Won contract to perform boroscope inspection for tubes in Abu Dhabi.
- Conducted Acoustic Emission Testing (AET) for underground sump tanks in Malaysia.
- Completed Phased Array Ultrasonic testing (PAUT) for drums, columns, reboilers and tanks in Kazakhstan.
- Implemented Acoustic Emission Testing (AET) for reactors in Saudi Arabia.
- Secured contract for Short Range Ultrasonic Testing (SRUT) inspection on annular plate of storage tanks in Egypt.