- MISC LNG vessel Puteri Intan Satu boiler tube inspection at MMHE Johor Baru, Malaysia was carried out successfully for Alfa Laval, Singapore
- Wilmar Natural Oleo’s 2nd inspection was carried out in Malaysia
- MODECc Ghana carried out their 6th & 7th inspection on their FPSO in Ghana offshore
- PTRS carried out inspection for PT Shell (retail division) in Indonesia
- MISC LNG vessel Puteri Mutiara Satu boiler tube inspection at MMHE Johor Baru, Malaysia was carried out successfully for Alfa Laval, Singapore
- PT. Pupuk Kaltim fertilizer inspection was carried out at Bontang, Indonesia
- BP-Tangguh 8th inspection was carried out in Indonesia
- Petronas Melaka refinery’s 10th inspection was carried out successfully in Malaysia
- PT. Shell (retail) 2nd inspection was carried out in Indonesia
- OMV Petrom 4th inspection was carried out in Kazakhstan successfully
News & Events
3rd QTR 2024
Some notable projects for 2024, Quarter 3: Carried out AUT Inspection on Subsea Pipeline in UAE Performed Eddy Current Testing inspection on heat exchanger tubes in UAE Accomplished Acoustic Emission Testing (AET) inspection for tanks Read more…