- MISC LNG vessel Puteri Delima Satu boiler tube inspection at Keppel, Singapore was carried out successfully for Alfa Laval, Singapore
- 2nd inspection for Eco Green, Batam, Indonesia was carried out in Indonesia ABS successfully
- Fire Tube Boiler inspection at PT. BMJ, Indonesia was carried out successfully
- Acid Chem’s 7th inspection was carried out successfully in Malaysia
- First inspection at Jordan Bromine Company’s HX inspection was carried out successfully in Jordan
- First inspection at TNB Port Dickson was carried out in Malaysia
- 8th inspection by MODEC Ghana was carried out on their FPSO in Ghana offshore
- Wilmar Oleo, Malaysia’s 3rd inspection was carried out successfully
Categories: News & Events