• Major Petronas Melaka refinery shutdown job completed successfully with around 47, 000 tubes inspected.
  • 8th inspection for Acidchem, Malaysia was carried out successfully
  • AMOC, Egypt Fin Fan Cooler tube inspection was carried out successfully
  • First Boiler tube inspection job for BW Offshore Singapore for Azurite FPSO was carried out successfully
  • 3rd inspection for Toray Synthetics, Indonesia was carried out successfully
  • Acoustic Emission Testing (AET) was carried out successfully at Jordan Bromine Plant (fuel storage tank, water storage tank)
  • Long Range Ultrasonic Testing (LRUT) was carried out successfully at Alexandrea National Refining & Petrochemical Company, Egypt (9 no’s  22” lines and 1 no 24” line)
  • Long Range Ultrasonic Testing (LRUT) was carried out successfully at Alexandrea Mineral Oil, Egypt (Boiler Radiation Section Tubes, 80 no 4” tubes, 4 no 6” tubes & 4 no’s 8” tubes)
  • Magnetic Flux Leakage (MFL) Tank Floor Inspection was carried out successfully at Suban Gas Field for Conoco Phillips, Indonesia for 2 no’s Condensate Storage Tanks
  • Magnetic Flux Leakage (MFL) Tank Floor Inspection was carried out successfully at Rawa Gas Field for Conoco Phillips, Indonesia for 1 no Crude Oil Tank
  • Magnetic Flux Leakage (MFL) Tank Floor Inspection was carried out successfully for North Caspian Operating Company (NCOC) in Kazakhstan for SWS Feed Tank
  • Corrosion Mapping with RMS2 was carried out successfully for North Caspian Operating Company (NCOC) in Kazakhstan for Pressure Vessel (Closed Drain drum)

EVENTS: ( 4TH QTR 2015)

  • Arise Global participated in 07th Middle  East NDT Conference and Exhibition from 13-16th September in Bahrain. Acoustic Eye Dolphin G3 system and High temperature LRUT ring were on display. A large numbers of visitors evinced interest in our offering and services.

[nggallery id = 9]