• Two (2) Acoustic Pulse Reflectometry Boiler Tube Inspections were carried out successfully at an oleochemical plant in Malaysia
  • Acoustic Pulse Reflectometry for LP Fin Fan Cooler Inspection was carried out successfully at a power plant in Indonesia.
  • Acoustic Pulse Reflectometry for Heat Exchanger Tube Inspection was carried out successfully at a natural gas plant in Egypt
  • Acoustic Pulse Reflectometry for Economizer Tube Inspection was carried out successfully at a utilities plant in Kuwait.
  • Acoustic Pulse Reflectometry for Preheater & Boiler Tube Inspection was carried out successfully at a petrochemical plant in Abu Dhabi
  • Acoustic Pulse Reflectometry for Waste Condenser Tube Inspection was carried out successfully at a chemical plant in Indonesia
  • Acoustic Pulse Reflectometry for Coal Boiler Tube Inspection was carried out successfully at a commodity manufacturing plant in Indonesia.
  • Acoustic Emission Inspection for one (1) Above Ground Storage Tank Bottom was carried out successfully at a refinery at Malaysia.
  • Acoustic Emission Inspection for one Above Ground Storage Tank Bottom was carried out successfully at a refinery at Singapore.
  • Long Range Ultrasonic Testing (LRUT) inspection carried out in UAE.
  • Long Range Ultrasonic Testing (LRUT) inspection carried out insulated and coated lines in Egypt.
  • Three (3) Magnetic Flux Leakage (MFL) inspection for Bottom Tank conducted in Indonesia.
  • Six (6) Magnetic Flux Leakage (MFL) inspection for Bottom Tank conducted in Kazakhstan.
  • Three (3) ECT Tube Inspection -Heat Exchangers carried out successfully in UAE.
  • Four (4) IRIS Tube Inspection -Heat Exchangers carried out successfully in UAE.
  • Eight (8) RFT Inspection was conducted on the tubing of Inlet Oil exchanger at various onshore & offshore facilities in Kazakhstan.
  • Two (2) ECT Inspection on Amine Regenerator Reboiler conducted in Kazakhstan.
  • Two (2) VTR Inspection was conducted on the tubing of Inlet Oil exchanger in Kazakhstan.
  • IRIS Tube Inspection for Heat Exchangers carried out successfully in UAE.
  • ECT Equipment Supply carried out successfully in UAE.
  • ECT Probe Supply carried out successfully in UAE.
  • Pulsed Eddy Current Testing on Pipeline & Pressure Vessel carried out successfully in Oman.
  • PEC CUI inspection for Pressure Vessel carried out successfully in Indonesia.
  • Eight (8) Phased Array Ultrasonic Testing (PAUT) inspections carried out at various onshore & offshore facilities in Kazakhstan.
  • Three (3) Phased Array Ultrasonic Testing (PAUT) inspections carried out in UAE
  • MPT, UTM, PAUT and VI (API 510) inspections carried out for LPG Tank at Cilegon, Indonesia.
  • Four (4) Alternating Current Field Measurement (ACFM) inspection on DD shaft, couplings, etc. for Crack Depth carried out successfully in UAE.
  • Three (3) Surface Eddy Current Testing for Lifting Equipment’s conducted in UAE.
  • Boroscopic Inspection carried out successfully in UAE.
  • Two (2) RMS carried out successfully in UAE.
  • SRUT Annular Plate Inspection of Storage Tanks carried out successfully in UAE.