• Acoustic Emission Inspection for one 110 m diameter Above Ground Storage Tank Bottom was carried out successfully at a refinery at Abu Dhabi, UAE.
  • Acoustic Emission Inspection for Above Ground Water Pipeline was carried out successfully at Singapore.
  • Two (2) heat exchanger APR Inspection were successfully conducted in UAE for a total of 900 tubes.
  • One (1) heat exchanger tube APR inspection was successfully carried out at Malaysia for a total of 1000 tubes.
  • One (1) boiler tube APR inspection was successfully carried out at Malaysia for a total of 1000 tubes.
  • Two (2) heat exchanger tube inspections were successfully conducted in Indonesia for a total of 3000 tubes.
  • Two (2) Long Range Ultrasonic Testing (LRUT) inspection carried in Kazakhstan.
  • Two (2) Magnetic Flux Leakage (MFL) inspection for Bottom Tank conducted in Egypt.
  • Magnetic Flux Leakage (MFL) inspection for Bottom Tank on Annual plates conducted in Kazakhstan.
  • Magnetic Flux Leakage (MFL) inspection for Bottom Tank conducted in Indonesia.
  • Four (4) ECT Tube Inspection -Heat Exchangers & Chillers were conducted in UAE.
  • One (1) ECT Tube Inspection on Three Acid Coolers was conducted in Egypt.
  • Two (2) IRIS Tube Inspection -Heat Exchangers carried out successfully in UAE.
  • One (1) RFET-Remote Field Testing of Amine Heat Exchanger carried out successfully in UAE.
  • One (1) PEC CUI inspection for Vessel carried out successfully in Indonesia.
  • One (1) PEC Offshore Risers Inspection carried out successfully in Egypt.
  • PEC Inservice Line Inspection carried out successfully in Egypt.
  • Nine (9) Phased Array Ultrasonic Testing (PAUT) inspections carried out in UAE.
  • Seven (7) Phased Array Ultrasonic Testing (PAUT) inspections carried out at various onshore & offshore facilities in Kazakhstan.
  • Three (3) Phased Array Ultrasonic Testing (PAUT) inspections carried out in Malaysia.
  • One (1) Phased Array Ultrasonic Testing (PAUT) inspections carried out in Indonesia.
  • Two (2) ACFM Inspection Services carried out successfully in UAE.
  • Three (3) UT,MT,PT,VT,HT conducted in Kazakhstan.
  • Five (5) Surface Eddy Current/ Boroscopic Inspection carried out successfully in UAE.
  • One (1) UT, UTG,MPI, PT, Hardness Testing carried out successfully in UAE.
  • Four (4) UT conducted in Egypt.
  • One (1) AUT- Automated Ultrasonic Testing conducted on storage tanks in Algeria.
  • One (1) RMS Inspection on Water Tank conducted in Malaysia.
  • One (1) UT crawler on storage tank conducted in Malaysia.
  • Three (3) RVI for HE carried out successfully in Indonesia.
  • One (1) SRUT Annular Plate Inspection of 29 Storage Tanks carried out successfully in UAE.
  • One (1) CUPS inspection by SRUT Method carried out in Indonesia.
  • One (1) SRUT Inspection on Storage Tank Annular Plates conducted in Malaysia.
  • One (1) SRUT on in Service Annular Plate Tank Bottom Inspection was conducted in Egypt.