- Eight (8) heat exchanger APR Inspections were successfully conducted in Malaysia for a total of 1500 tubes.
- Four (4) heat exchanger tube APR inspections were successfully carried out in Indonesia for a total of 1000 tubes.
- Ten (10) RFT inspections conducted successfully for heat exchanger tubes in Kazakhstan.
- Five (5) IRIS Inspections conducted successfully for heat exchanger tubes in Kazakhstan.
- One (1) IRIS heat exchanger tube inspection successfully carried out in UAE.
- One (1) CUI inspection for storage tank and vessel by PEC LYFT conducted successfully in Indonesia.
- Four (4) Phased Array Ultrasonic Testing (PAUT) conducted successfully in Malaysia.
- One (1) evaluation of High Temperature Hydrogen Attack (HTHA) for critical equipment at a refinery was successfully done in UAE.
- Three (3) PAUT inspection services carried out successfully in UAE.
- One (1) PAUT welding inspection on pipeline conducted successfully in Indonesia.
- Six (6) encoded thickness measurement survey of drums / columns / reboilers / tanks / UT-MAT area / bends conducted successfully in Kazakhstan.
- One (1) ACFM Inspection for pressure vessels manway and nozzles carried out successfully at a Gas processing plant in UAE.
- Two (2) UT,MT,PT,VT,HT, RT inspections carried out successfully in Kazakhstan.
- Three (3) RT / X-Ray inspection on new construction welds and final steel structural products conducted successfully in Egypt.
- One (1) Surface Eddy Current Testing (SECT), UTG and API inspection of Mud Gas separator carried out successfully in UAE.
- One (1) MPI inspection on cranes carried out successfully in UAE.
- One (1) UTG on pipes carried out successfully in UAE.
- Three (3) Remote Visual Inspection (RVI) conducted successfully in UAE.