Some notable projects for 2024, Quarter 4:

  • Carried out Magnetic Flux Leakage (MFL) tank floor inspection in Egypt.
  • Performed Phased Array Ultrasonic Testing (PAUT) of tanks in UAE.
  • Accomplished ECT, MFL & IRIS Inspection of Heat Exchanger Tube in Turkmenistan.
  • Executed Phased Array Ultrasonic Testing (PAUT), thickness measurement survey of drums/columns/reboilers/tanks in Kazakhstan.
  • Won contract for Acoustic Emission Testing (AET) inspection for tanks in Pakistan.
  • Conducted Acoustic Pulse Reflectometry inspection (APRIS) of tube bundle-heat exchanger in UAE.
  • Completed Magnetic Flux Leakage (MFL) tank floor inspection in Indonesia.
  • Implemented Acoustic Emission Testing (AET) inspection of 15 tanks in Indonesia.
  • Secured contract for AUT HIC Inspection of oil separator in UAE.
  •  Landed contract for Acoustic Pulse Reflectometry inspection (APRIS) of condenser tubes in UAE.
  • Carried out RMS inspection on tank in Malaysia.
  •  Performed Phased Array Ultrasonic Testing (PAUT) corrosion mapping in Egypt.
  •  Accomplished Long Range UT (LRUT) inspection of pipeline in Egypt.
  • Executed Acoustic Emission Testing (AET) inspection services of vessels in UAE.
Categories: News & Events